Agricoltura, Vermeer T1255 con trencher al lavoro
agricoltura | info | prezzo | dati | produzione
Vermeer T1255 con trencher in azione a Las Vegas mentre effettua scavo in roccia. Macchina operatrice dalle produzioni eccellenti. Per ulteriori informazioni contattatemi.
Commento
-
what are they doing ? expo ?
-
Can someone explain 1) the reason for the digging of the trench, 2) why this is apparently being filled in without anything being evidently put in there? Am I missing something here?
-
الهذلي
-
กๅ
-
-
MONSTER MAULWURF :)
-
That guy is sdanding in a very dangerous spot!
-
Tizio! Cuanto costa!
-
Closing my browser. My head hurts thinking about this. I came here for the cool machines , not to be confused.
-
@James Campbell - Maybe they're being paid by the hour.
-
Nobody told the shovel driver!
-
Backfill without a Pipe?
-
Dude don't fill it in yet we've not put the pipe in! they can't leave an open trench for safety reasons but damn what a shame the pipe couldn't go straight in !
-
luar negri memang canggih...
amaging....
-
they do that because they can't leave an open trench for safety reasons. This way, once all the trenching is done and they're ready to lay the pipe, an excavator can come in, and dig the sections that they're going to work in, and only those sections.
<ran a TesMec 1175 for five years
-
Man - check out that GAP
-
ok I figured it out. They are doing multiple ditches side by side. see how the left side is sloughing in at 1:05. Its already been trenched. So they must be planning on doing 3 passes to fit that enormous pipe in the trench.
-
Stimulus money at work. Problem is only created 3 jobs and made some congressman's son rich off the contract
-
Stimulus money at work. Problem is only created 3 job
Vermeer T1255 con trencher in azione a Las Vegas mentre effettua scavo in roccia. Macchina operatrice dalle produzioni eccellenti. Per ulteriori informazioni contattatemi.
Commento
what are they doing ? expo ?
Can someone explain 1) the reason for the digging of the trench, 2) why this is apparently being filled in without anything being evidently put in there? Am I missing something here?
الهذلي
กๅ
MONSTER MAULWURF :)
That guy is sdanding in a very dangerous spot!
Tizio! Cuanto costa!
Closing my browser. My head hurts thinking about this. I came here for the cool machines , not to be confused.
@James Campbell - Maybe they're being paid by the hour.
Nobody told the shovel driver!
Backfill without a Pipe?
Dude don't fill it in yet we've not put the pipe in! they can't leave an open trench for safety reasons but damn what a shame the pipe couldn't go straight in !
luar negri memang canggih...
amaging....
amaging....
they do that because they can't leave an open trench for safety reasons. This way, once all the trenching is done and they're ready to lay the pipe, an excavator can come in, and dig the sections that they're going to work in, and only those sections.
<ran a TesMec 1175 for five years
Man - check out that GAP
ok I figured it out. They are doing multiple ditches side by side. see how the left side is sloughing in at 1:05. Its already been trenched. So they must be planning on doing 3 passes to fit that enormous pipe in the trench.
Stimulus money at work. Problem is only created 3 jobs and made some congressman's son rich off the contract
Stimulus money at work. Problem is only created 3 job